MARINE NOTICE

No. 01/2019

21 August 2019

INSTALLING FLASH LIGHT ON THE REEF NORTH OF AIWO BOAT HARBOR

DATE:

  • With effect from 21 August 2019 to 30 January 2021.
     

LOCATION:

  • North of Aiwo Boat Harbour bounded within the following co-ordinates.
    • A – Latitude 00° 31’ 42.26” S / Longitude 166° 54’ 32.61” E
    • B – Latitude 00° 31’ 42.64” S / Longitude 166° 54’ 32.66” E
    • C – Latitude 00° 31’ 40.01” S / Longitude 166° 54’ 37.89” E
    • D – Latitude 00° 31’ 39.04” S / Longitude 166° 54’ 33.31” E
    • E – Latitude 00° 31’ 37.88” S / Longitude 166° 54’ 33.69” E
    • F – Latitude 00° 31’ 36.47” S / Longitude 166° 54’ 39.03” E

WORKING HOURS:

  • hrs including Sunday and Public Holiday.

DETAILS:

  • The flashing lights installing on the reef is consist of 22 lights to marking the platform for piling works on the new Port Constructions. These lights may exhibit red and white continuous flashing at night time.

CAUTION:

  • Public and Mariners are advice to:
    1. Keep well clear around of the working area not closer than 100m from the reef and from the sea side;
    2. Maintain a proper lookout at all times;
    3. Proceed at safe speed and to navigate with caution;
    4. Communicate with Nauru Port Control on VHF Channel 72 & 16.

Please call Capt. Siosifa Tu’angalu at Mob. Ph.: +674 557 9232 for clarification regarding this Public & Marine Notice.

Capt. Siosifa P Tu’angalu
Harbour Master/Port Pilot
Nauru Port Authority

 

__

__

 

MARINE NOTICE

No. 02/2019

26th November 2019

INSTALLING FLASH LIGHT ON THE REEF NORTH OF AIWO BOAT HARBOR 

DATE:

  • With effect from 26 November 2019 to 30 December 2020.

 

LOCATION:

  • North of Aiwo Boat Harbour bounded within the following co-ordinates.
    • A – Latitude 00° 31’ 47” S / Longitude 166° 54’ 36” E
    • B – Latitude 00° 31’ 46” S / Longitude 166° 54’ 37” E
    • C – Latitude 00° 31’ 44” S / Longitude 166° 54’ 33” E
    • D – Latitude 00° 31’ 46” S / Longitude 166° 54’ 32” E

WORKING HOURS:

  • hrs including Sunday and Public Holiday.

 

DETAILS:

  • The construction of the water desalination plant pipelines on the reef south of Aiwo Boat Harbor will commenced on 26th November 2019 is expected to complete on 30th December 2020.
  • The pump house for water desalination plant is also relocated in the area affected in the above co-ordinates.

 

CAUTION:

  • Public and Mariners are advice to:
    1. Keep well clear around of the working area not closer than 100m from the reef and from the sea side;
    2. Maintain a proper lookout at all times;
    3. Proceed at safe speed and to navigate with caution;
    4. Communicate with Nauru Port Control on VHF Channel 72 & 16.

Please call Capt. Siosifa Tu’angalu at Mob. Ph.: +674 557 9232 for clarification regarding this Public & Marine Notice.